jerry-sandoval-8020-builders-general-contractor-denver-colorado.jpg

Jerry Sandoval

SUPERINTENDENT

I've been in commercial construction a little over 20 years.

My dad was a framer and a glazer, so I was exposed to the industry as a kid. It was a comfortable career to step into and provide for my family. 

Little did I know that over 20 years later I would still be doing it!

Through the years I've experienced a lot of different aspects of construction. I started working with concrete doing flatwork, and grew my skills over time. The experience in the field performing the work helps me keep jobs running smoothly.

I'm detail oriented and being able to lead a crew of people, even people you have never met, making something out of nothing.

Being able to drive around this town and show the kids and the family what I've been a part of is very satisfying.


Notable Career Projects


PREVIOUS EXPERIENCE

Centric/Jones • 1995 to 2000

Foreman

As a carpenter, I learned various types of work in the field; concrete flatwork, dry packing, sack rubbing concrete walls, framing, installing backing, setting different types of doors and jambs, door hardware, form setting, and a few others.


Pinkard Construction • 2000 to March 2006

Carpenter Foreman

 
8020-builders-general-contractor-colorado-2.png
 
Ran form setting crews. From walls to decks, doing take offs for concrete, shooting elevations, running theodolites and total stations bringing buildings out of the ground.

Opus • March 2006 to August 2015

General Foreman /Superintendent

 
8020-builders-general-contractor-colorado-2.png
 
Superintendent on The Pinnacle as City Park South-a two tower condominium project. It just hit 8 years old and had zero construction defect lawsuits.

Holland Construction • August 2015 to August 2016

Superintendent

Worked on the 17W project, 180 million dollar project, multistory with three towers 14 floors each. Commercial on the first floor with apartments above, about 580 units. Some of what I was overseeing is the elevators which there are thirteen, stairwells, misc. metals, mep level three down and the vertical to the roof. Also level three down with all finishes. This includes lobby finishes to parking garages. Level three is under all three towers and is five floors.

 
8020-builders-general-contractor-colorado-2.png
 
Overseeing thirteen elevator installations, stairwells, miscellaneous metals, and everything from lobby finishes to parking garages.

Opus • August 2016 to February 2018

Superintendent

 
 
Highlight: Superintendent on the 92,000 square foot Charter Communication Building. During the second phase we erected a second floor, steel and concrete, and added an elevator. First and third phase was building out a 25,000 square foot data center.

Personal Interests

I'm a guy of few words. I enjoy being outdoors and spending quality time with my family.